3,485
(latest NCVER data)CPCCCA3019 Erect and dismantle formwork to suspended slabs, columns, beams and walls prepares learners to build rigid formwork that holds wet concrete to the correct line, level and finish in above-ground construction, then strip and recover components safely. RTOs can add it to carpentry and formwork programs where learners work on multi-level structures, and CPCCCA3019 training materials give trainers a ready delivery base.
Learners develop skills in interpreting drawings, setting out and assembling formwork with support systems, bracing for rigidity, fabricating shutters and edge boxing, installing block-outs and cast-in services, applying release agents and stripping, cleaning and storing reusable components.
Get our CPCCCA3019 RTO training materials and avoid building formwork content from first principles. Purchase RTO materials and deliver the CPCCCA3019 training resources alongside your own practical formwork set-ups.
Your CPCCCA3019 RTO training materials bring together learner content, trainer support and assessment documents for suspended slab, column, beam and wall formwork. Purchase RTO materials to give trainers CPCCCA3019 training resources that link drawings to on-site erection and stripping.
Check the latest unit requirements on training.gov.au before delivery. Your team should contextualise and validate these CPCCCA3019 training materials for its learner cohort, delivery model and selected compliance environment. Use the supplied mapping as a starting point when reviewing your CPCCCA3019 materials against the Standards for RTOs.
CPCCCA3019 Erect and dismantle formwork to suspended slabs, columns, beams and walls focuses on erecting and dismantling formwork that contains concrete for suspended slabs, columns, beams and walls in above-ground construction. It includes setting out, assembling and bracing formwork and sorting materials for re-use.
The unit addresses five core areas:
The tasks reflect a suspended slab of at least 10 square metres that incorporates a beam, a wall, two column types and block-outs and cast-in services. Check that your training yard or partner site can support this before scheduling assessment.
Yes. The unit allows prefabricated or in situ formwork, and the editable files let your team add the specific proprietary system and manufacturer instructions you use.
They introduce common faults and rectification methods, and the Class Activities Book gives learners practice identifying problems before they work on live formwork.
They are developed as compliant learning resources, but your team should still contextualise and validate them for its equipment, sites and cohort before delivery.
Yes. Lifetime updates are available under the applicable product terms, so qualifying updates can be accessed without repurchasing.
By submitting this form, you agree to the TotalVET Training Resources Privacy Policy.
CPCCCA3020 Erect and dismantle jump form formwork
CPCCCA3022 Install curtain walling
CPCCCA3024 Install lining, panelling and moulding
CPCCCA3025 Read and interpret plans, specifications and drawings for carpentry work
CPCCCA3026 Assemble partitions
CPCCCA3027 Set up, operate and maintain indirect action powder-actuated power tools





