15
(latest NCVER data)Defective corbels, girders, stringers and decking must be removed and replaced without compromising the rest of a timber bridge. RIICTB305E Install or replace super-structure members focuses on this jacking, fitting and securing work, and RTOs can add it to bridge maintenance pathways for experienced crews, supported by RIICTB305E learning materials built around the replacement sequence.
Learners develop skills in locating and levelling bed logs, bolting temporary headers, positioning toms and jacks, bracing and jacking the structure, removing defective members, measuring, fitting and treating new members, installing connectors and returning the bridge to its settle point.
Skip writing super-structure content from scratch and choose our RIICTB305E RTO training materials as a ready framework. Purchase RTO materials and give trainers RIICTB305E training resources that match the demands of real bridge replacement work.
Your RIICTB305E learning materials provide a prepared foundation for installing and replacing timber bridge super-structure members. Purchase RTO materials to save development effort, with RIICTB305E training materials ready for contextualisation.
Check the latest unit requirements on training.gov.au before delivery. Your team should contextualise and validate these RIICTB305E training materials for its learner cohort, delivery model and selected compliance environment. Use the supplied mapping as a starting point when reviewing your RIICTB305E materials against the Standards for RTOs.
RIICTB305E Install or replace super-structure members covers installing and dismantling temporary supports, fitting new super-structure members and applying durability treatments in civil construction. It applies to operational workers who work under minimal supervision and use some discretion in selecting equipment and contingency measures.
The unit addresses five core areas:
The tasks cover installing and removing temporary supports, selecting and preparing timber, applying preservatives and marking out and cutting a corbel or girder. They are developed as compliant learning resources, but assessors should confirm timber and equipment are available for each occasion.
Yes. The editable files let your team add procedures and specifications for its own jacks, toms and bracing systems.
Yes. The resources introduce timber grading and selection so learners can choose suitable members before cutting and fitting.
Yes. Lifetime updates are available under the applicable product terms, so qualifying updates can be accessed without buying again.
Request a free sample to review the layout, depth and presentation of the resources.
By submitting this form, you agree to the TotalVET Training Resources Privacy Policy.
RIICTB306E Splice and connect timber members
RIICTT301E Conduct fluid assisted directional boring
RIICTT303E Control micro tunnelling and pipe-jacking operations
RIICTT306E Install cure in-place linings for existing pipeline systems
RIICTT309E Install slip lining in existing pipeline systems
RIICWD501E Prepare detailed design of foundations





