17,255
(latest NCVER data)In industrial plants and commercial buildings, induction motors drive pumps, fans and conveyors, and they must be connected, tested and commissioned correctly; UEEEL0024 Test and connect alternating current (a.c.) rotating machines* develops the ability to do this safely. RTOs offering electrotechnology apprenticeships can use it to build motor connection skills, with UEEEL0024 training materials covering single and three phase machines.
Learners develop skills in connecting three phase motors in star and delta, connecting, running and reversing single and three phase motors, performing insulation resistance, continuity and winding identification tests, determining operating parameters and identifying faults and causes of low efficiency.
Equip your team with our UEEEL0024 RTO training materials to deliver a.c. machine content without starting from scratch. Purchase RTO materials and support practical sessions with UEEEL0024 training resources built for motor workshops.
Your UEEEL0024 training materials bring together learner content, trainer support and assessment documents for testing and connecting a.c. rotating machines. Purchase RTO materials to save development effort, with UEEEL0024 training resources ready for review.
Check the latest unit requirements on training.gov.au before delivery. Your team should contextualise and validate these UEEEL0024 training materials for its learner cohort, delivery model and selected compliance environment. Use the supplied mapping as a starting point when reviewing your UEEEL0024 materials against the Standards for RTOs.
UEEEL0024 Test and connect alternating current (a.c.) rotating machines* covers testing and connecting a.c. rotating machines and solving problems in servicing, fault finding, installation and compliance work. It applies to electrical workers working with single and three phase motors.
The unit addresses five core areas:
Learners need access to single phase and three phase induction motors with suitable test equipment. Your team should confirm machines can be connected in star and delta and reversed safely.
Yes. The content covers induction motor efficiency, MEPS and full load power factor, giving learners context for identifying causes of low efficiency.
Yes. The editable UEEEL0024 training resources allow assessors to adjust scenarios and nameplate data, as long as the unit requirements remain covered.
No. They are developed as compliant learning resources, but your organisation remains responsible for validation and audit outcomes.
Yes. Free samples are available so your team can check layout and depth before you purchase RTO materials.
By submitting this form, you agree to the TotalVET Training Resources Privacy Policy.
UEEEL0025 Test and connect transformers*
UEEEL0028 Conduct compliance and functional verification of electrical apparatus and existing circuits
UEEEL0029 Conduct compliance inspection of LV electrical installations with demand exceeding 100 A per phase
UEEEL0030 Conduct compliance inspection of single phase LV electrical installations
UEEEL0033 Conduct electrical tests on LV electrical machines
UEEEL0039 Design, install and verify compliance and functionality of general electrical installations*





