15
(latest NCVER data)RIICTB304E Install or replace sub-structure members prepares learners to replace the headstocks, sills, abutments, braces and wales that carry a timber bridge, while weighing how the work affects load capacity. This unit gives RTOs a practical option for bridge construction programs aimed at experienced crews, with RIICTB304E training resources structured around major and minor member replacement.
Learners develop skills in assessing project implications on bridge load capacity, measuring original components, preparing and fitting major and minor sub-structure members, applying durability treatments, installing connectors, removing temporary supports and conducting follow-up inspections.
Give your team our RIICTB304E RTO training materials instead of developing sub-structure replacement content internally. Purchase RTO materials and support crews with RIICTB304E training materials that follow the sequence of real member replacement work.
These RIICTB304E training resources provide a prepared foundation for installing and replacing timber bridge sub-structure members. Purchase RTO materials to reduce development time, with RIICTB304E RTO training materials your team can contextualise to its bridge assets.
Check the latest unit requirements on training.gov.au before delivery. Your team should contextualise and validate these RIICTB304E training materials for its learner cohort, delivery model and selected compliance environment. Use the supplied mapping as a starting point when reviewing your RIICTB304E materials against the Standards for RTOs.
RIICTB304E Install or replace sub-structure members covers assessing project implications on bridge capacity, preparing and erecting major and minor sub-structure members and applying durability treatments in civil construction. It applies to operational workers who work under minimal supervision across varied work contexts.
The unit addresses five core areas:
Yes. The tasks are built around planning, preparing and erecting at least one major and one minor sub-structure member to design specifications. They are developed as compliant learning resources, but your team should confirm access to a suitable bridge or training structure.
Yes. The editable files allow your team to include local engineering drawings, design specifications and job plans where contextualisation is permitted.
The Learner Guide introduces how member replacement and temporary supports affect bridge capacity, giving learners a basis for discussing implications with supervisors and engineers.
No. The unlimited student licence allows use with all enrolled learners, subject to the applicable licence conditions.
Yes. A free sample lets your team review structure and presentation before you purchase RTO materials.
By submitting this form, you agree to the TotalVET Training Resources Privacy Policy.
RIICTB305E Install or replace super-structure members
RIICTB306E Splice and connect timber members
RIICTT301E Conduct fluid assisted directional boring
RIICTT303E Control micro tunnelling and pipe-jacking operations
RIICTT306E Install cure in-place linings for existing pipeline systems
RIICTT309E Install slip lining in existing pipeline systems





